Infrastructure - Excellent Utilities at the Seelze Site
Infrastructure - Excellent Utilities at the Seelze Site
The optimum infrastructure is in place for companies looking to move to
Seelze Industrial Park. Approx. 100,000 m² of land is currently available for
development. We are able to offer appropriate utilities through connection to
the infrastructure used by the companies which are currently located at the
park.
Power supply
Modern combined heat and power plant (gas and steam
turbine)
Electricity: Works grid 6 kV, with max. load of 10 MW. Emergency power
supply for approx. 2 MW via gas turbines
Steam: Generation at 40 bar. Steam networks at pressure levels of 3.5/9.5
and 16 bar are available throughout the site.
Water supply
Drinking water network at 3 bar
Demineralised water at 2 bar mains pressure for production
Service water network for cooling, cleaning and extinguishing water, 6
bar
Emergency supply independent of the power mains is ensured by diesel
pumps
Supply of compressed air, nitrogen and
cooling facilities
3/6 bar works networks for control air and compressed air
40,000 pallet locations for storing chemicals with different hazard
classifications
Internal transportation for provision and collection of raw materials and
finished products
Order picking and dispatch of goods
Professional handling of incoming goods, incl. customs clearance, stock
controlling and inventory management procedures in accordance with standard SAP
methods
Transport links
Link to A2 and A7 motorways
Hanover-Langenhagen airport
Site rail network linked up to Deutsche Bahn railway network